Analisis Kinerja KeuanganProyek Pembangunan Sentral PLTD Unit VII Gudang Garam Kediri Menggunakan Metode Earned Value (Eva)

  • Syntya Arum Dani Maghfiroh Magister Manajemen, Pascasarjana Universitas Islam Kadiri
  • Sri Wahyuni Mega Hastuti Magister Manajemen, Universitas Islam Kadiri, Kediri Indonesia

Abstract

A project is a temporary series of activities that takes place within a limited timeframe, with allocated specific resources, and is intended to carry out tasks whose objectives have been clearly defined. In a project, project management is necessary to organize, coordinate, and carry out activities within the project, such as the development project of the PLTD Unit VII Warehouse of Gudang Garam Kediri, which is the subject of this research. Project control is needed to ensure that the project is completed according to plan. Value analysis can be applied to determine the performance index of completed project work. The performance of the project execution in the 20th week in terms of cost shows that project expenses are higher than planned costs, as indicated by the Cost Performance Index (CPI) with a result of 0.898 < 1. Meanwhile, in terms of schedule, there is a delay, indicated by the Schedule Performance Index (SPI) with a result of 0.960 < 1. If the project execution performance in the 20th week remains the same until the end of the project, the estimated total cost of project execution (EAC) required is Rp. 36,421,987,702.67, then the project will incur a loss of Rp. 3,710,669,761.04 or a loss percentage of 11.334% from the planned cost. The estimated project completion time (EAS) based on reporting data in the 20th week is 52.66 weeks, indicating a delay in completing the work of 16.66 weeks or a delay percentage of 46.28% from the planned project schedule of 36 weeks. Some solutions to overcome the occurring delay include adding overtime work hours to critical path activities, implementing shift work systems, and maximizing the productivity of labor and available tools.

References

Acebes, F., Pajares, J., Galán, J. M., & López-Paredes, A. (2013). Beyond Earned Value Management: A Graphical Framework for Integrated Cost, Schedule and Risk Monitoring. Procedia - Social and Behavioral Sciences, 74, 181–189. https://doi.org/10.1016/j.sbspro.2013.03.027
Acebes, F., Poza, D., González-Varona, J. M., & López-Paredes, A. (2021). Stochastic Earned Duration Analysis for Project Schedule Management. Engineering, xxxx. https://doi.org/10.1016/j.eng.2021.07.019
Ajiono, R. (2018). Analisis Faktor Risiko Penawaran Di Bawah Estimasi Terhadap Kinerja Kualitas Proyek Konstruksi Bangunan di Kota Trenggalek Jawa Timur. UKaRsT, 2(2), 70. https://doi.org/10.30737/ukarst.v2i2.373
Almeida, R., Abrantes, R., Romão, M., & Proença, I. (2021). The impact of uncertainty in the measurement of progress in earned value analysis. Procedia Computer Science, 181(2019), 457–467. https://doi.org/10.1016/j.procs.2021.01.191
Bakhtiar, A. (2018). PENILAIAN PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PENINGKATAN JALAN MENGGUNAKAN METODE EARNED VALUE. 8(2), 401–408.
Beigi, F., Hosseini, M., & Qodsi, S. (2016). The Effect of the Earning Transparency on cost of capital common stock based on The Fama-French and Momentum Factors. Procedia Economics and Finance, 36(2005), 244–255. https://doi.org/10.1016/s2212-5671(16)30035-1
Castollani, A., Puro, S., & Lesmana, M. (2020). Analisis Biaya dan Waktu pada Proyek Apartemen Dengan Metode Earned Value Concept. 3(1), 39–48.
Filisia Grisela Nggotutu Tisano Tj. Arsjad, M. S. (2019). Analisis Biaya Dan Waktu Dengan Menggunakan Metode Nilai Hasil Pada Pekerjaan Proyek Stie Nusa Ina Universitas Kristen Petra, Amahai, Masohi, Maluku Tengah. Jurnal Sipil Statik, 7(10), 1295–1303.
Gardjito, E. (2017). PENGENDALIAN JADWAL DAN ANGGARAN TERPADU DENGAN METODE EARNED VALUE ANALYSIS PADA PEKERJAAN KONSTRUKSI. 1(1), 19–26.
Hidayah, R. Ridwan, A. Cahyo, Y., S. (2015). ANALISA PERBANDINGAN MANAJEMEN WAKTU ANTARA PERENCANAAN DAN PELAKSANAAN. Jurnal Manajemen Teknologi & Teknik Sipil, 1(2), 281–290. http://repository.unhas.ac.id/bitstream/handle/123456789/16524/SKRIPSI
Hidayat, A. (2017). Pelaksanaan Proyek Konstruksi Dengan Metode Earned Value ( Studi Kasus Proyek Konstruksi Mall Dan Hotel X Di Pekanbaru ). 1(1).
Irmayanti, N., Ridwan, A., Poernomo, Y. C. S., Wicaksono, H., & Rahmawaty, F. (2021). Efisiensi Harga Satuan Pekerjaan Konstruksi Gedung Dengan Metode BOW (Burgerlijke Openbare Werken), SNI (Standart Nasional Indonesia) Dan Lapangan. Jurnal Manajemen Teknologi & Teknik Sipil, 4(2), 99. https://doi.org/10.30737/jurmateks.v4i2.2022
Martini, R. S., Kimi, S., & Mulya, S. (2020). Analisis Biaya Dan Waktu Berdasarkan Analisa Produksivitas Alat Berat Pekerjaan Tanah Galian (Pembuatan Pit) Pada Proyek Instalasi Pengolahan Air Limbah. Bearing : Jurnal Penelitian Dan Kajian Teknik Sipil, 6(4), 268–273. https://doi.org/10.32502/jbearing.3222202064
Mishakova, A., Vakhrushkina, A., Murgul, V., & Sazonova, T. (2016). Project Control Based on a Mutual Application of Pert and Earned Value Management Methods. Procedia Engineering, 165, 1812–1817. https://doi.org/10.1016/j.proeng.2016.11.927
N, R. A., S, D. R., & Kistiani, F. (2015). Pengendalian Biaya Dan Waktu Proyek Dengan Metode Konsep Nilai Hasil ( Earned Value ). Jurnal Teknika, 7(4), 671–675.
Natalia, M., Misriani, M., Mirani, Z., Pratawijaya, Y., & Hidayah, N. (2019). Analisis dan Evaluasi Kinerja Proyek Pembangunan Gedung Shelter SDN 27 Lengayang Pesisir Selatan dengan Metode Earned Value. Jurnal Teknik Sipil ITP, 6(2), 71–77. https://doi.org/10.21063/jts.2019.v602.05
Nufah, Y. W., Yanti, G., & Lubis, F. (2019). Analisis Proyek Dengan Metode Earned Value Concept (Studi Kasus Pada Proyek Pembangunan Jalan Tol Ruas Pekanbaru – Dumai Seksi 2 STA. 9+500 - 33+600). Seminar Nasional Cendekiawan Ke 5 Tahun 2019 Buku 1: ”Teknologi Dan Sains“, 1, 1–7.
Purnomo, A., Nugroho, M. W., Yulianto, T., Studi, P., Sipil, T., Hasyim, U., & Jombang, T. (2019). Pengendalian Biaya dan Waktu Proyek Gedung SMK Dwija Bhakti Jombang Dengan Menggunakan Metode Earned Value. Tecnoscienza, 4(1), 40–52.
Sakinah, K. N. (2021). ANALISIS KINERJA BIAYA DAN WAKTU MENGGUNAKAN METODE EARNED VALUE DAN EARNED SCHEDULE PADA PROYEK PEMBANGUNAN VILLA PASIR ANGIN PUNCAK-BOGOR. 3(1).
Sandriawan, R., Endro, B., Ryan, Y., Prasetyo, F., Sipil, J. T., Teknik, F., & Trisakti, U. (2021). EARNED VALUE ANALYSIS PADA PROYEK INSTALASI PIPA BOILER PT XYZ Tbk PROJECT DELAY ANALYSIS WITH EARNED VALUE ANALYSIS CONCEPT TO BOILER PIPE INSTALLATION PROJECT ON PT XYZ Tbk ’ s. 560–568.
Setiawan, D. C., Ridwan, A., & Suwarno, S. (2021). Optimalisasi Penjadwalan Proyek Pembangunan Gedung Puskesmas Badas Menggunakan Critical Path Method-Project Evaluation and Review Technique (CPM-PERT). Jurnal Manajemen Teknologi & Teknik Sipil, 4(2), 71. https://doi.org/10.30737/jurmateks.v4i2.2011
Sukmono, E. P., & Apriani, W. (2021). Pengendalian Biaya dan Waktu dengan Metode Earned Value ( Studi Kasus : Rancang dan Bangun Sistem Penyediaan Air Minum Kota Dumai 450 LPD Tahap 1A ). 04.
Sumanang, I. R., & Indartono Rivai. (2021). EVALUASI BIAYA DAN WAKTU DENGAN EARNED VALUE PADA PROYEK GEDUNG SPORTAINMENT TELKOM CORPORATE UNIVERSITY GEGERKALONG BANDUNG. 20(2), 106–128.
Wahyuni, E., & Hendrawan, B. (2018). ANALISIS KINERJA PROYEK “Y”MENGGUNAKAN METODE EARNED VALUE MANAGEMENT (Studi Kasus di PT Asian Sealand Engineering). Journal of Applied Business Administration, 2(1), 60–78. https://doi.org/10.30871/jaba.v2i1.784
Wibowo, S. T., Suwarno, S., Ridwan, A., Wicaksono, H., & Rahmawaty, F. (2021). Optimalisasi Biaya dan Waktu Proyek Kontruksi Pelebaran Jalan Menggunakan Earned Value. Jurnal Manajemen Teknologi & Teknik Sipil, 4(2), 1. https://doi.org/10.30737/jurmateks.v4i2.1828
Zakariyya, B., & Ridwan, A. (2020). Analisis Biaya Dan Jadwal Proyek Pembangunan Gedung Dinas Kesehatan Kabupaten Trenggalek Dengan Metode Earned Value. 4(2). https://doi.org/10.1016/j.omega.2005.10.004.Analisis
Zhong, S., & Wang, X. (2011). Improvement and application of earned value analysis in coal project management. Procedia Engineering, 26(2010), 1983–1989. https://doi.org/10.1016/j.proeng.2011.11.2394
Published
2024-05-22
How to Cite
MAGHFIROH, Syntya Arum Dani; MEGA HASTUTI, Sri Wahyuni. Analisis Kinerja KeuanganProyek Pembangunan Sentral PLTD Unit VII Gudang Garam Kediri Menggunakan Metode Earned Value (Eva). Otonomi, [S.l.], v. 24, n. 1, p. 89-95, may 2024. ISSN 2657-1684. Available at: <https://ejournal.uniska-kediri.ac.id/index.php/otonomi/article/view/5273>. Date accessed: 21 dec. 2024. doi: https://doi.org/10.32503/otonomi.v24i1.5273.